Back to Standards Coverage

Civil Engineering II

Engineering · Texas TEKS

Standards Code§127.416
CreditTwo Credits
Duration18-36 weeks
Sub-Standards97 / 106
Coverage92%
StrandStandard IDStandard StatementCovered?CLX Match List
1. The Student Understands How To Implement An Engineering Design Process To Develop A Pro...1.1.1describe and implement the stages of an engineering design process to construct a model• Gittel Grant : Unit 1: Introduction to STEM : Unit 1: Introduction to STEM: Lesson 03-04
• Gittel Grant : Unit 1: Introduction to STEM : Unit 1: Introduction to STEM: Lesson 03-04
• Certify ED : Fundamentals of Robotics (Video & VR) : Fundamentals of Robotics - Unit 05 - Robotics Hardware: Components, Design, and Sensors
• STEM Advancement Inc. : Introduction to STEM : Introduction to STEM 2: Engineering Design Process and Keeping a Log Book
• STEM Advancement Inc. : Introduction to STEM : Introduction to STEM 2: Engineering Design Process and Keeping a Log Book
1.1.2explain how factors, including complexity, scope, resources, ethics, regulations, manufacturability, maintainability, and technology, impact stages of the engineering design process• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 03 Design Aspects of Flight Vehicles
• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 03 Design Aspects of Flight Vehicles
• Open Textbooks : Fundamentals of Business, 4th edition : Fundamentals of Business: Chapter 04 Ethics and Social Responsibility
1.1.3explain how stakeholders impact an engineering design process;• Open Textbooks : Introduction to Architecture : Introduction to Architecture
• Open Textbooks : Adaptive Apparel Design : Adaptive Apparel Design
• Open Textbooks : Adaptive Apparel Design : Adaptive Apparel Design
• Gittel Grant : Unit 4: Robotics and Automation : Unit 4: Robotics and Automation: Lesson 19-20
• GoSkills : Project Management Basics (2026) : Project Management Basics (2026)
1.1.4analyze how failure is often an essential component of the engineering design process• Gittel Grant : Unit 1: Introduction to STEM : Unit 1: Introduction to STEM: Lesson 05-06
• Certify ED : Fundamentals of Robotics (Video & VR) : Fundamentals of Robotics - Unit 09 - Debugging and Database Management in Robotics
2. The Student Explores The Methods And Aspects Of Project Management In Relation To Proje...2.1.1research and explain the process and phases of project management, including initiating, planning, executing, and closing• Core-LX : All Lessons : Construction Project Management (pending)
• Pointful Education : Project Management : ProjMgmt 02: Project Management Planning Part I
• GoSkills : Project Management Basics : Project Management Basics: 02 Planning
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
• GoSkills : Project Management Framework (2026) : Project Management Framework (2026)
2.1.2explain the roles and responsibilities of team members, including project managers and leads• Pointful Education : Project Management : ProjMgmt 03: Project Management Planning Part II
• Pointful Education : Project Management : ProjMgmt 03: Project Management Planning Part II
• GoSkills : Team Leadership : Team Leadership: 02 Team Processes
• Pointful Education : Startups and Innovation : Module 06: Building a Team
• Pointful Education : Healthcare Management and Information Systems : HMIS 08: Management and Leadership Part II
2.1.3research and evaluate methods and tools available for managing a project• Pointful Education : Project Management : ProjMgmt 04: Tools and Systems
• Pointful Education : Project Management : ProjMgmt 04: Tools and Systems
• Pointful Education : Project Management : ProjMgmt 04: Tools and Systems
• Core-LX : All Lessons : Lean Six Sigma: Solution Generation and Project Closure (pending)
• GoSkills : Project Management Basics : Project Management Basics: 02 Planning
2.1.4discuss the importance of developing and implementing a system for the organization of project documentation such as file naming conventions, document release control, and version control• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 22: Information Management
• Medcerts : Dental Assistant - DA 3000 : Infection Control in Dental Healthcare Settings (v24.3) DA3011
• Pointful Education : Project Management : ProjMgmt 11: Business Analysis Roles and Responsibilities
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 19: Cost and Financial Management
• Core-LX : All Lessons : Medical Billing: Claims Submission, Clearinghouses, and Electronic Remittance (pending)
2.1.5describe how project requirements, constraints, and deliverables impact the project schedule and influence an engineering design• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
• GoSkills : Project Management Basics : Project Management Basics: 02 Planning
• Core-LX : NCCER Project Management : Earned Value Management (pending)
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 14: Introduction to Project Scheduling
• Core-LX : NCCER Carpentry L1 : Stair Layout Mathematics (pending)
2.1.6explain how a project budget, including materials, equipment, and labor, is developed and maintained;• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 19: Cost and Financial Management
• Open Textbooks : Basic Kitchen and Food Service Management : 05: Budget and Business Planning
• Open Textbooks : Basic Kitchen and Food Service Management : 05: Budget and Business Planning
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 04: Project Delivery Methods
• OpenStax : Introduction to Business : 10.5 Production and Operations Control (pending)
2.1.7describe the importance of management of change (MOC) and how MOC applies to project planning• Core-LX : NCCER Project Management : Negotiation and Conflict Resolution (pending)
• Core-LX : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management
• Core-LX : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management
• Core-LX : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management
• Core-LX : All Lessons : Lean Six Sigma: Solution Generation and Project Closure (pending)
3. The Student Recognizes Project Stakeholders And Industry Organizations In Civil Enginee...3.1.1describe the roles and objectives of project stakeholders, including engineer, owner, architect, contractor, subcontractors, project manager, end users, regulatory agencies, and the public;• Pointful Education : Project Management : ProjMgmt 11: Business Analysis Roles and Responsibilities
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 10: Procurement and Purchasing
• Certify ED : Emergency Medical Response (Video&VR) : Emergency Medical Response - Unit 37 - Incident Command and Mass Casualty Response
• Certify ED : Emergency Medical Response (Video&VR) : Emergency Medical Response - Unit 37 - Incident Command and Mass Casualty Response
• WorkForge : Introduction to Manufacturing Careers - Level 1 - WorkForge : PRO-1001 What is Project Management
3.1.2describe the mission and membership benefits of industry organizations such as the American Society of Civil Engineers, the National Society of Professional Engineers, and the Society of Women Engineers• Pointful Education : Agriscience III : Agriscience_03 01: The Agriscience Industry
• Certify ED : Culinary Arts 2 : Culinary Arts 2 - Unit 12 - Professional Organizations and Regulations
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 40 - Careers in Agricultural Science
• Certify ED : Animal Science (Video & VR) : Animal Science - Unit 02 - Understanding Animals: Taxonomy, Economics, Careers, and Safety
• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 02 Preparations
4. The Student Explores Various Disciplines Within Civil Engineering. The Student Is Expec...4.1.1describe the essential technical knowledge and functions in a variety of civil engineering subdisciplines, including environmental, geotechnical, transportation, structural, water resources, and construction• Core-LX : All Lessons : Construction Project Management (pending)
• Pointful Education : Building Maintenance Technologies : BuildMT 02: The Construction Industry Part I
• Pointful Education : Building Maintenance Technologies : BuildMT 04: Basic Hand and Power Tools
• Pointful Education : Building Maintenance Technologies II : BuildMTII05: The Built Environment Part I
• Pointful Education : Building Maintenance Technologies II : BuildMTII06: The Built Environment Part II
4.1.2explain how different types of projects within civil engineering subdisciplines, including public works, transportation, urban development, water resources, and utility projects, impact the built environment;• Pointful Education : Building Maintenance Technologies : BuildMT 02: The Construction Industry Part I
• Pointful Education : Building Maintenance Technologies : BuildMT 04: Basic Hand and Power Tools
• Pointful Education : Building Maintenance Technologies II : BuildMTII05: The Built Environment Part I
• Pointful Education : Building Maintenance Technologies II : BuildMTII05: The Built Environment Part I
• Pointful Education : Building Maintenance Technologies II : BuildMTII06: The Built Environment Part II
4.1.3identify and describe types of civil engineering projects• Core-LX : All Lessons : Construction Project Management (pending)
• Pointful Education : Building Maintenance Technologies : BuildMT 02: The Construction Industry Part I
• Pointful Education : Building Maintenance Technologies : BuildMT 04: Basic Hand and Power Tools
• Pointful Education : Building Maintenance Technologies II : BuildMTII05: The Built Environment Part I
5. The Student Explores How Codes, Regulations, And Plats Impact A Civil Engineering Proje...5.1.1research and describe regulations established by the American Disabilities Act relevant to site design• Open Textbooks : AMERICAN GOVERNMENT (2E – SECOND EDITION) : Chapter 5: Civil Rights
5.1.2identify local codes and regulations for a civil engineering project• Pointful Education : Building Maintenance Technologies II : BuildMTII02: Drafting and Federal Codes
• Pointful Education : Building Maintenance Technologies II : BuildMTII02: Drafting and Federal Codes
• Certify ED : Electrical (Video & VR) : Electrical - Unit 01 - Electrical Power Generation and Safety
• Certify ED : HVAC 1 (Video & VR) : HVAC 1 - Unit 01 - HVAC Fundamentals: Principles, Systems, and Safety
5.1.3describe the potential impacts of local codes and regulations on civil engineering projects;• Pointful Education : Building Maintenance Technologies II : BuildMTII02: Drafting and Federal Codes
• Certify ED : Electrical (Video & VR) : Electrical - Unit 01 - Electrical Power Generation and Safety
• Certify ED : HVAC 1 (Video & VR) : HVAC 1 - Unit 01 - HVAC Fundamentals: Principles, Systems, and Safety
5.1.4describe the purpose of a plat and easements for a civil engineering projectno genuine match
6. The Student Develops A Proposal For A Civil Engineering Project Such As A Park, A Parki...6.1.1analyze or develop a feasibility report for a civil engineering project• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 06: Rough Order of Magnitude (ROM) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 07: Modeled Square Foot (SF) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 08: Assemblies Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
• Open Textbooks : Principles of Managerial Accounting : Principles of Managerial Accounting: 11 Capital Budgeting Decision Making
6.1.2develop and analyze the scope of work document for a civil engineering project• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 10: Procurement and Purchasing
• Pointful Education : Project Management : ProjMgmt 05: Traditional Plan-Based Methodologies and Scheduling
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
• Core-LX : NCCER Project Management : CPM Scheduling and Network Diagrams (pending)
6.1.3calculate monetary value for engineering efforts on a given project• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 06: Rough Order of Magnitude (ROM) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 07: Modeled Square Foot (SF) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 08: Assemblies Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 19: Cost and Financial Management
6.1.4revise and archive the draft project proposal for scope of work changes• Pointful Education : Future of Home Construction : FHC 04: Project Planning in Home Construction
• Pointful Education : Future of Home Construction : FHC 04: Project Planning in Home Construction
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
6.1.5develop a client deliverable package that contains a fee proposal, project schedule, organizational chart, exclusions, and an engineering contract• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 04: Project Delivery Methods
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 16: Risk and Contract Management
• Pointful Education : Future of Home Construction : FHC 06: Contracts and Regulations in Home Construction
• Core-LX : NCCER Project Management : Earned Value Management (pending)
6.1.6communicate effectively a final proposal for a civil engineering project;• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 10: Reporting Results
• Pointful Education : Project Management : ProjMgmt 11: Business Analysis Roles and Responsibilities
• OpenStax : English II : 4.4 Lesson 4.4: Formal Presentations (pending)
• GoSkills : Body Language : Body Language: 02 Start to Improve Your Body Language
• GoSkills : Body Language : Body Language: 04 Getting in Front of People
6.1.7identify and evaluate lessons learned from the project proposal process• Core-LX : All Lessons : Lean Six Sigma: Solution Generation and Project Closure (pending)
• Pointful Education : Project Management : ProjMgmt 01: Introduction to Project Management
• Pointful Education : Project Management : ProjMgmt 13: Course Wrap-up/Final Exam
• Gittel Grant : Unit 1: Introduction to STEM : Unit 1: Introduction to STEM: Lesson 03-04
7. The Student Develops A Civil Engineering Project Schedule. The Student Is Expected To:7.1.1identify and prioritize project tasks to determine the critical path of a project• Core-LX : NCCER Project Management : CPM Scheduling and Network Diagrams (pending)
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 15: Network Scheduling
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
7.1.2create a project critical path diagram• Core-LX : NCCER Project Management : CPM Scheduling and Network Diagrams (pending)
• Core-LX : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management : NCCER 38 - CPM Scheduling and Network Diagrams NCCER Project Management
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 15: Network Scheduling
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 15: Network Scheduling
7.1.3evaluate project tasks and the critical path to develop a project schedule• Core-LX : NCCER Project Management : CPM Scheduling and Network Diagrams (pending)
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 15: Network Scheduling
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 15: Network Scheduling
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 18: Schedule Management
7.1.4create a Gantt chart for all the project activities in a project;• GoSkills : Project Management Basics (2026) : Project Management Basics (2026)
• GoSkills : Project Management Basics : Project Management Basics: 02 Planning
• Core-LX : Manufacturing (Iowa State Gap) : MRP and Production Scheduling (pending)
• OpenStax : Introduction to Business : 10.5 Production and Operations Control (pending)
7.1.5assess a project schedule for opportunities to improve project efficiencies• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 18: Schedule Management
• Core-LX : All Lessons : Construction Project Management (pending)
• Core-LX : All Lessons : Lean Six Sigma: Solution Generation and Project Closure (pending)
8. The Student Develops A Civil Engineering Design For A Project Site. The Student Is Expe...8.1.1create a concept site plan using existing schematics, survey data, and regulatory design manuals• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
• Pointful Education : Architectural Design II : Architecture_02 01: Basic Architectural Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
8.1.2identify existing and proposed utility providers, including electric, water, sewer, gas, and telecommunications providers, at a project site• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
8.1.3research and identify existing plats and easements for a project site;• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
8.1.4revise and finalize a project site plan to reflect analyzed site data, including utilities, geotechnical, right-of-way, water resources, environmental, survey, and transportation data• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : LEED Green Associate : LEED 03: Location, Transportation, and Sustainable Sites
• Pointful Education : LEED Green Associate : LEED 06: Materials and Resources
9. The Student Explores Concepts And Calculations For Storm Water Events Used By Water Res...9.1.1describe storm event probability based on historical models• OpenStax : Introductory Statistics : Two Basic Rules of Probability (pending)
• OpenStax : Introductory Statistics : Probability Topics (pending)
• OpenStax : Precalculus 2e : Section 11.7: Probability (pending)
9.1.2describe methods used, including Rational method, Natural Resources Conservation Service (NRCS), Soil Conservation Service (SCS), and unit hydrograph, to calculate flow rate• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
9.1.3analyze existing topography at the project site to determine drainage patterns• Open Textbooks : Geographic Information Systems and Cartography : GIS and Cartography: 08 Raster Data and Imagery Analysis
• Open Textbooks : Geographic Information Systems and Cartography : GIS and Cartography: 08 Raster Data and Imagery Analysis
9.1.4delineate existing and proposed drainage areas impacting a project site to determine the change in stormwater runoff generated by a project design• Open Textbooks : Geographic Information Systems and Cartography : GIS and Cartography: 08 Raster Data and Imagery Analysis
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
9.1.5research and describe methods of stormwater mitigation and water quality treatment• Open Textbooks : Water Services and Distribution Systems : Water ServiceDistribution Systems: 04 Describe Alternative Green Water Supply Systems
• TPC : TPC Waste Water Treatment : 381 Introduction to Water Technology
• TPC : TPC Waste Water Treatment : 382 Wastewater Treatment Processes
9.1.6calculate the existing flow rates for a 5-year and a 100-year storm event for a project site using the Rational method• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
9.1.7analyze and calculate the proposed flow rates for a 5-year and a 100-year storm event for a project design• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
9.1.8determine the required stormwater remediation techniques for a 100-year storm event by comparing existing and proposed runoff quantities• TPC : TPC Waste Water Treatment : 382 Wastewater Treatment Processes
• TPC : TPC Waste Water Treatment : 382 Wastewater Treatment Processes
9.1.9describe methods of stormwater conveyance, including channel, culvert, and pipe• TPC : TPC Waste Water Treatment : 382 Wastewater Treatment Processes
• TPC : TPC Waste Water Treatment : 382 Wastewater Treatment Processes
9.1.10calculate the hydraulics of a stormwater conveyance using the continuity equation, energy equation, and Bernoulli's equation• TPC : TPC Process Control Instrumentation : 275 Flow Measurement
• Open Textbooks : Basic Lighting for Electricians: Level 1 : Basic Lighting for Electricians: Level 1 02: Common Lighting Units and Measurement
9.1.11design a conveyance system such as a pipe, culvert, or open channel to convey stormwater runoff for a 100-year storm event using the calculated data• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 13: Designing a Site Utilization Plan
9.1.12create a plan and profile sheet of a drainage system, including surface elevations, slopes, conveyance system dimensions, material, and pipe invert elevations;• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Core-LX : NCCER 01 - Site Layout Instruments NCCER Carpentry Level 1 : NCCER 01 - Site Layout Instruments NCCER Carpentry Level 1
9.1.13describe potential impacts of a drainage analysis for a project• Pointful Education : Building Maintenance Technologies II : BuildMTII07: Sustainability Issues
• Open Textbooks : Environmental Science : Environmental Science: Chapter 03
10. The Student Explores Concepts And Calculations Used By Geotechnical Engineers. The Stud...10.1.1identify and explain the components of a geotechnical report, including boring samples and logs, soil types and classifications, pavement recommendations, foundations recommendations, and soil preparations• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 13 - Land Management and Soil Testing
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 13 - Land Management and Soil Testing
10.1.2identify and determine the soil classifications at a project site using the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Web Soil Survey (WSS)• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 03: Soil Physics
10.1.3calculate the plasticity index of soil from a project site• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 03: Soil Physics
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 03: Soil Physics
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 03: Soil Physics
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 03: Soil Physics
10.1.4research and describe methods of soil preparation• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 13 - Land Management and Soil Testing
• Open Textbooks : Farming as We Know It: How Humans are Impacting Agriculture : Farming as We Know It: How Humans are Impacting Agriculture
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 06: Soil Fertility and Management
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 06: Soil Fertility and Management
• Core-LX : NCCER 17 - Earthmoving Fundamentals and Soil Math NCCER Heavy Equipment Operations Level 1 : NCCER 17 - Earthmoving Fundamentals and Soil Math NCCER Heavy Equipment Operations Level 1
10.1.5research and explain how geotechnical results impact pavement recommendations used in civil engineering projects• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 12 - Land Use
• Open Textbooks : Farming as We Know It: How Humans are Impacting Agriculture : Farming as We Know It: How Humans are Impacting Agriculture
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
10.1.6research and select the most effective pavement section for a project;• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 12 - Land Use
• Open Textbooks : Farming as We Know It: How Humans are Impacting Agriculture : Farming as We Know It: How Humans are Impacting Agriculture
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 13 - Land Management and Soil Testing
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
10.1.7describe the impact of a geotechnical analysis for a project• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Open Textbooks : Soils Laboratory Manual : Soils Laboratory Manual 02: Soil Formation, Classification, and Mapping
• Certify ED : Agricultural Science (Video & VR) : Agricultural Science - Unit 12 - Land Use
• Open Textbooks : Farming as We Know It: How Humans are Impacting Agriculture : Farming as We Know It: How Humans are Impacting Agriculture
11. The Student Explores Concepts And Calculations Used By Structural Engineers. The Studen...11.1.1identify and analyze the various types of building foundations, including raft, monolithic slab, slab on grade, pier and beam, spread footing, mat footing, drilled piers, pylons, waffle slab, and post-tension slab• Certify ED : Carpentry (Video & VR) : Carpentry - Unit 04 - Foundations and Footings: Engineered Lumber, Concrete, and Construction Techniques
11.1.2describe the forces common to structural engineering calculations, including gravity, tension, compression, flexure, and torsion• Gittel Grant : Unit 1: Introduction to STEM : Unit 1: Introduction to STEM: Lesson 09-10
• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 03 Design Aspects of Flight Vehicles
11.1.3describe the loads common to structural engineering calculations, including dead load, live load, environmental loads, and other loads such as lateral and concentrated loadsno genuine match
11.1.4diagram and explain how applied loads and forces are resisted in a structure and transferred to the Earthno genuine match
11.1.5diagram a simply supported beam subjected to loading conditions to determine reaction forcesno genuine match
11.1.6sketch diagrams to determine the maximum shear and moment resulting in the beamno genuine match
11.1.7identify the different types of trusses, including simple, planar, and space frame trusses• Pointful Education : Building Maintenance Technologies : BuildMT 13: Framing a Roof
• Certify ED : Carpentry (Video & VR) : Carpentry - Unit 07 - Roof Framing and Construction
11.1.8diagram a truss subjected to loading conditions to determine reaction forces and identify the zero force membersno genuine match
11.1.9explain why design loads are dictated by building codes;• TPC : TPC Building & Grounds Maintenance : 361 Introduction to Carpentry
• Certify ED : Carpentry (Video & VR) : Carpentry - Unit 02 - Fundamentals of Carpentry: Tools, Drawings, and Building Codes
11.1.10describe potential impacts of a structural analysis for a projectno genuine match
12. The Student Explores Concepts And Calculations Used By Transportation Engineers. The St...12.1.1identify and describe various types of transportation engineering specializations such as rail, aviation, roadway, highway, and marine• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 03 Design Aspects of Flight Vehicles
• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 03 Design Aspects of Flight Vehicles
• Pointful Education : Smart Cities: Technology and Applications : SCT 03: Smart Transportation
• Pointful Education : Smart Cities: Technology and Applications : SCT 03: Smart Transportation
• Pointful Education : Smart Cities: Technology and Applications : SCT 06: Smart Mobility
12.1.2research and explain the benefits of having a professional transportation engineering certificationno genuine match
12.1.3research and explain the benefits of membership in a transportation engineering organization such as Institute for Transportation Engineers (ITE), American Society of Highway Engineers (ASHE), American Association of State Highway and Transportation Officials (AASHTO), and WTS International• Certify ED : Culinary Arts 2 : Culinary Arts 2 - Unit 12 - Professional Organizations and Regulations
• Pointful Education : Early Childhood Education II : EarlyChildEd_02 01: Professionalism Part I
12.1.4determine stopping sight distance of a roadway given the design speed and grade• Open Textbooks : Fundamentals of Math, Physics, and Statistics for Future Transportation Professionals : FMPS: 09 Data Analysis – Hypothesis Testing, Estimating Sample Size, and Modeling
12.1.5research and describe the impacts of transportation design elements, including grades, superelevation, design speed, friction factor, lane widths, vertical curves, horizontal curves, roadway classification, acceleration, and deceleration• Open Textbooks : Fundamentals of Math, Physics, and Statistics for Future Transportation Professionals : FMPS: 09 Data Analysis – Hypothesis Testing, Estimating Sample Size, and Modeling
12.1.6analyze the level of service of a roadway to determine if operating conditions are adequateno genuine match
12.1.7identify and explain the components of a traffic impact analysis (TIA), including data collection summary, trip analysis, turn lane analysis, project phasing, and sight visibility analysis• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 02: Collecting and Preparing Data
• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 02: Collecting and Preparing Data
12.1.8research and identify methods of traffic data collection• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 02: Collecting and Preparing Data
• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 02: Collecting and Preparing Data
• OpenStax : Principles of Data Science : 1 Overview of Data Collection Methods (pending)
12.1.9collect and calculate traffic count data at a project site and analyze the results of the traffic count to determine peak hour trips and traffic mitigation• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 03: Descriptive Statistics
• Open Textbooks : Fundamentals of Math, Physics, and Statistics for Future Transportation Professionals : FMPS: 09 Data Analysis – Hypothesis Testing, Estimating Sample Size, and Modeling
12.1.10determine the peak hour trips generated by a given land use from a ITE Trip Generation Manual• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 03: Descriptive Statistics
12.1.11research and describe traffic level of service for various roadways• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 03: Descriptive Statistics
12.1.12determine if a turn lane is warranted based on peak hour trips and traffic volume;• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 04: Inferential Statistics and Modeling
12.1.13describe potential impacts of a transportation analysis for a project• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 10: Reporting Results
• Core-LX : Principles of Data Science : Principles of Data Science - Chapter 10: Reporting Results
13. The Student Develops Construction Documents For A Civil Engineering Project. The Studen...13.1.1develop project construction documents that includes design plans, specifications, and a cost estimate for a civil engineering project• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 06: Rough Order of Magnitude (ROM) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 07: Modeled Square Foot (SF) Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 08: Assemblies Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
13.1.2develop the analysis reports for a civil engineering project• Core-LX : All Lessons : Construction Project Management (pending)
• Pointful Education : Project Management : ProjMgmt 02: Project Management Planning Part I
• Pointful Education : Project Management : ProjMgmt 05: Traditional Plan-Based Methodologies and Scheduling
13.1.3generate a demolition sheet that contains existing topography, property lines, easements, utilities, rights-of-way, drainage infrastructure, and structures, and identifies items to be demolished• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
13.1.4develop a fire protection plan for a project• Certify ED : Construction Safety (OSHA) (Video & VR) : Construction Safety (OSHA) - Unit 23 - Fire Protection and Prevention
• Certify ED : Construction Safety (OSHA) (Video & VR) : Construction Safety (OSHA) - Unit 23 - Fire Protection and Prevention
• Pineapple Academy : Foodservice Essentials : Foodservice Essentials: 06 Foodservice Safety
13.1.5generate a paving plan that shows the limits and types of pavement necessary for a project• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
13.1.6generate a site plan that labels proposed improvements for a project• Pointful Education : Architectural Design II : Architecture_02 01: Basic Architectural Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
13.1.7generate a site dimensional control plan containing measurements for all site improvements for a project• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
13.1.8generate a grading plan that documents proposed elevations and topography in comparison to existing topography for a project• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
13.1.9generate drainage plans that document the existing drainage patterns, proposed drainage plan, and drainage infrastructure for a project• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
13.1.10generate a utility plan that documents existing and proposed utility types, locations, and materials for a project• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 05: Basic Civil Drawings
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
• Pointful Education : Architectural Design II : Architecture_02 06: Preparing Computer-Aided Drawings (CAD) Part I
13.1.11generate an erosion control plan that identifies erosion control best management practices (BMP) defined by the Texas Commission on Environmental Quality (TCEQ) for a project;• Pointful Education : Agriscience III : Agriscience_03 06: Plant Pest Control
• Pointful Education : Agriscience III : Agriscience_03 07: Maintenance of Facilities, Tools, and Equipment
• Pointful Education : LEED Green Associate : LEED 06: Materials and Resources
13.1.12explain the importance of a quality control review and complete a quality control review of the construction documents of the project• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
• Pointful Education : Communication Skills for Business : Communication Skills for Business 04: Best Practices for Creating Business Deliverables Part I
• Pointful Education : Adobe Photoshop Certification : APC 11: Publishing Digital Media
14. The Student Develops Documents For Support Of The Construction Bid. The Student Is Expe...14.1.1identify components of a bid tabulation, including item description, material quantity, unit measure, unit price, and total price• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
14.1.2compare a project bid tabulation with corresponding construction documents to verify all items are included• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
14.1.3create a project bid tabulation;• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
• Open Textbooks : Fundamentals of Building Construction Management : CON 02 Fundamentals of Building Construction Management 09: Unit Price Cost Estimating
14.1.4identify and compile the parts of civil engineering project manual• Pointful Education : Building Maintenance Technologies II : BuildMTII01: Construction Documents, Contracts, and Specifications
15. The Student Works As An Individual And A Team Member To Complete Projects. The Student ...15.1.1track team goals to verify completion of project milestones• GoSkills : Project Management Basics (2026) : Project Management Basics (2026)
• GoSkills : Project Management Framework (2026) : Project Management Framework (2026)
• GoSkills : Project Management Basics (2026) : Project Management Basics (2026)
15.1.2explain various methods to resolve conflict within a project team• Core-LX : NCCER Project Management : Negotiation and Conflict Resolution (pending)
• Core-LX : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management
• Core-LX : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management : NCCER 37 - Negotiation and Conflict Resolution NCCER Project Management
• GoSkills : Team Leadership : Team Leadership: 04 Decision Making and Conflict Resolution
• OpenStax : Principles of Marketing : 4 Managing the Distribution Channel (pending)
15.1.3explain how leadership impacts project outcomes and team members;• Open Textbooks : Fundamentals of Business, 4th edition : Fundamentals of Business: Chapter 01 Teamwork in Business
• Open Textbooks : Fundamentals of Business, 4th edition : Fundamentals of Business: Chapter 08 Management and Leadership
• OpenStax : Introduction to Business : 6.4 Leading, Guiding, and Motivating Others (pending)
• GoSkills : Team Leadership : Team Leadership: 02 Team Processes
• GoSkills : Project Management Basics (2026) : Project Management Basics (2026)
15.1.4evaluate team member performance and effectiveness in a project• Open Textbooks : Fundamentals of Business, 4th edition : Fundamentals of Business: Chapter 12 Managing Human Resources
• Pointful Education : LEED Green Associate : LEED 02: Integrative Strategies
• Pointful Education : Project Management : ProjMgmt 03: Project Management Planning Part II
• GoSkills : Team Leadership : Team Leadership: 02 Team Processes
• Pointful Education : Startups and Innovation : Module 06: Building a Team
16. The Student Researches And Understands The Code Of Ethics Pertaining To Civil Engineeri...16.1.1research and describe the impact of the State of Texas Engineering Practice Act;• Open Textbooks : Introduction to Aerospace Flight Vehicles : IAFV: 02 Preparations
• Pointful Education : Project Management : ProjMgmt 02: Project Management Planning Part I
• Pointful Education : Architectural Design III : Architecture_03 04: Professional Ethics and Legal Responsibilities
• Pointful Education : Architectural Design III : Architecture_03 04: Professional Ethics and Legal Responsibilities
• Pointful Education : Early Childhood Education II : EarlyChildEd_02 01: Professionalism Part I
16.1.2analyze and discuss ethical case studies using Texas Administrative Code, Title 22, Part 6, Chapter 137, Subchapter C (relating to Professional Conduct and Ethics)• Pointful Education : Early Childhood Education II : EarlyChildEd_02 02: Professionalism Part II
• Pointful Education : Architectural Design III : Architecture_03 04: Professional Ethics and Legal Responsibilities
• Pointful Education : Architectural Design III : Architecture_03 04: Professional Ethics and Legal Responsibilities
• Certify ED : Emergency Medical Response (Video&VR) : Emergency Medical Response - Unit 03 - Ethics, Consent, and Legal Responsibilities
• Pointful Education : Project Management : ProjMgmt 02: Project Management Planning Part I
17. The Student Understands The Fundamental Sustainable Design Approaches And Practices In ...17.1.1research and describe sustainable building materials and methods• Core-LX : All Lessons : LEED Green Associate: Credit Requirements and Documentation (pending)
• Teach Construction : Green Building: Building Science Principles : Green Building: Building Science Principles - 06 Ventilation
• Core-LX : NCCER Construction Technology L1 : Residential Systems Integration (pending)
17.1.2identify and explain the programs and certifications that establish design criteria for engineering projects such as Leadership in Energy and Environmental Design (LEED)• Core-LX : All Lessons : LEED Green Associate: Credit Requirements and Documentation (pending)
• Pointful Education : LEED Green Associate : LEED 08: Project Surroundings, Public Outreach, and Exam Preparation
17.1.3explain how sustainable programs and certifications potentially impact the design elements and costs of a project• Core-LX : All Lessons : LEED Green Associate: Credit Requirements and Documentation (pending)
• Pointful Education : LEED Green Associate : LEED 08: Project Surroundings, Public Outreach, and Exam Preparation
17.1.4explain how design choices potentially impact human health, the environment, and the cost of a project;• Open Textbooks : Environmental Science : Environmental Science: Chapter 03
• Open Textbooks : Environmental Science : Environmental Science: Chapter 09
• Open Textbooks : Environmental Science : Environmental Science: Chapter 09
• Open Textbooks : Environmental Science : Environmental Science: Chapter 09
17.1.5explain how elements of the construction process potentially impact human health and the environment• Teach Construction : Green Building: Building Science Principles : Green Building: Building Science Principles - 06 Ventilation
• Open Textbooks : Environmental Science : Environmental Science: Chapter 09
• Open Textbooks : Environmental Science : Environmental Science: Chapter 09

Coverage Summary

Core-LX delivers strong coverage of this TEKS course at 92% of sub-standards aligned.

Primary publishers contributing alignment: Pointful Education (113), Open Textbooks (96), Core-LX (49), Certify ED (25), GoSkills (17).

Gap-closure roadmap (9 sub-standards not yet aligned, grouped by strand):

  • Strand 5. The Student Explores How Codes, Regulations, And Plats Impact A Civil Engineering Proje...: 1 sub-standard(s) — candidate for a focused Gap Lesson
  • Strand 11. The Student Explores Concepts And Calculations Used By Structural Engineers. The Studen...: 6 sub-standard(s) — candidate for a focused Gap Lesson
  • Strand 12. The Student Explores Concepts And Calculations Used By Transportation Engineers. The St...: 2 sub-standard(s) — candidate for a focused Gap Lesson
Eligible for Gap Lesson / Gap Lab generation — coverage exceeds the 85% threshold; any remaining sub-standard gaps will be closed by auto-generated lessons in the next pipeline phase.

Want to see this in your LMS?

Every badge above is deliverable through Canvas, Moodle, D2L, Blackboard, or any LTI-compatible LMS.

Schedule a Demo